add floor joists to an existing porch

Expert advice on how to build an outdoor patio roof or gazebo, with illustrated step-by-step instructions and construction diagrams. If it is impossible to attach the ledger to a floor joist, then fasten the ledger to wall studs, which are generally located on 16-inch (or sometimes 24-inch) centers and doubled 

Watch this video to find out how to remove a rotten wood porch floor, and replace it with pressure treated pine floor joists and tongue and groove flooring. Because there is some rot in the loose joist, too, we're adding another two-by-eight alongside it to help support it, which is called “sistering” the joist. The two boards are 

The solution: Floor joists for a deck are typically installed at 16 in. on center, which won't properly support some composite-decking products when installed on an angle. In new construction, be sure floor joists are installed at the correct spacing. In existing decks, adding more floor joists is the only remedy.

If you can't attach a ledger to a rim joist on a cantilevered floor, how can you build a deck on a raised ranch? The easiest way to do this is to remove the existing house rim joist and soffit and any insulation inside the cavities. Then nail PT deck joists alongside each house joist, making sure the 

NOTE: Make sure the ledger is level, or this will throw off the floor joist heights and cause an uneven floor. Side Rim Joist Cut and nail side Framing out porch walls is fairly straightforward -- with a few exceptions like adding builder's felt to the exposed house sheathing and tying into the house. NOTE: Your porch may have 

First, check the existing porch alignment to ensure that your porch frame is in square. Measure from opposite end to opposite end. If the two measurements are within a half inch, you're good to proceed. Ensure that your joists are installed with the crown on the upside Make sure that your porch from pitch or slope moves 

Build the Best Porch Flooring Structure. Joists, Bridging and Decking Materials. Your porch flooring structure must be structurally stable to not only maintain functionality but also its beauty over the years. What may surprise you is that floor joists on a traditional front porch foundation, unlike decks, run horizontal to your home 

The inspection ($300 to $500) will tell if you have structural problems, such as undersized joists, that will require professional repairs. However, you can usually remedy sagging problems yourself by “sistering” new joists alongside the existing ones (this also works for stiffening bouncy floors). First remove electrical cables, 

we always install the perimeter shear before we joist, to keep all walls stiff, and avoid knocking out of plumb the corners. I know its hard to visualize what I am asking, but do you think its ok to just sister another board to the existing bathroom joists and raise them up a little higher so that the new subfloor 

Rather than adding an extra layer of insulation above standard blockwork, the insulation is incorporated into the structure. Systems such as Jetfloor, Litecast XT and TETRiS use special insulated polystyrene infill panels between and beneath the floor beams, helping to eliminate cold bridging.

If the existing house has air bricks, ventilating existing floor voids for example, then ducting should be provided to allow air through the solid floor and into the void The timber floor joists should be sized correctly depending on their span (length between supports) and are normally laid across the shortest span from wall to 

In other words you can't build a “pony wall” and then install your floor joists on top of that wall because the concrete wall under the “pony wall” will not be laterally braced .. I recommend that you keep the patio slab at least 6 inches lower than the top of your existing concrete foundation wall and slope the slab away from the 

If your house was built since the mid 1990's there is a chance that the floor system is constructed with a MWJ (Manufactured Wood Joist) floor system. In these cases it is very important to consult with a building inspector, engineer or architect to understand how to correctly attach a ledger board to the house wall. [tip] Lower 

But my company still brings an existing deck or porch up to code, by adding joist hangers, flashing, ledger connections, and upgraded railings. It's not just safety I have in mind — bringing a deck up to code is also a great selling point. The simplicity of deck remodeling makes for few communication mistakes 

to floor-level extensions, and their support structures vary from grounded brackets to cantilevered floor joists. All deal with real-world restrictions, and none is without while adding architectural interest to the boxy former porch. Also owing to the cold climate, the bottom of the bump-out is framed with 2x8s to provide room for.

Building a 400 square foot addition. This is the first video in the series from layout to putting down the sub floor. Includes layout, concrete cutting, form

Slope is quite easy. 3 ways. First, is to cut full length wedges out of 2x4's or bigger & screw them to the top of the sub-floor at the joist locations. Second, is to remove the sub-floor too & sister-on pitched or sloped 2x4's or bigger. Third, is to use concrete or cement over the sub-floor & new decking, the floor 

Product Details

Product List