laying composite decking directly to ground

Align anchors with a long straight board. Check diagonal measurements to square the anchor positions. Approximate time (not including curing time): 3-4 hours. 3. Attach beams to post anchors. Attach beams post anchors - Build Ground-Level Deck. Use double 2 x 6s as beams. Attach them in the post anchors. Install a 

It's a "floating deck," which means it simply rests on blocks at ground level. I began by laying out cement blocks in a 4-foot grid, and spray painted around them to indicate their locations. . The decking boards are screwed in place with special composite decking screws that don't require pre-drilling.

Excavate the area for the floating deck, then using a laser level, move dirt until ground is level. A good way to check that all blocks are lined up is by using a straight piece of board and setting it through the X indentation of each block and see how they line up. Let dry. Make sure the Lay the Pressure-Treated Deck Joists.

Installing deck tiles can completely change the look of a garden. They can make a concrete patio seem far more inviting, or they can open up a space of bare ground. The beauty of If there are small cracks of less than 3 8 inch, you can lay the tiles directly on top as long as the sides of the crack are even. If the surfaces are 

Product Details

Product List